Skip to main content

NSYS 6163 Integrated Risk Management: Welcome & Course Readings

Welcome to your course guide

Please find your required library readings below. If you have problems with the links below, please contact the Library. If you have APA questions about these materials, please contact the Writing Center.

NSYS 6163 Required Course Readings

The links are for required readings found in the Walden databases ONLY. For all other readings, see your course resources.

Enter your myWalden user name and password at the prompt.

Lambert, J.H., Y.Y. Haimes, D. Li, R. Schooff, and V. Tulsiani 2001. Identification, ranking, and management of risks in a major system acquisition. Reliability Engineering and System Safety. 72(3):315-325.


Leung, M.F., J.H. Lambert, and A. Mosenthal 2004. A risk-based approach to setting priorities in protecting bridges against terrorist attacks. Risk Analysis. 24(4):963-984.

Haimes, Y.Y., S. Kaplan, and J.H. Lambert 2002. Risk filtering, ranking, and management framework. Risk Analysis . 22(2): 383-397.

Frohwein, H.I., J.H. Lambert, and Y.Y. Haimes 1999. Alternative measures of risk of extreme events in decision trees. Reliability Engineering and System Safety. 66:69-84.

Curry, R.E., Y.Y. Haimes, and J.H. Lambert 1999. Comparison of two models evaluating automobile safety features. Journal of Transportation Engineering. 125(2):129–137.

Eisele, J.S., Y.Y. Haimes, N. Garber, D. Li, J.H. Lambert, P. Kuzminski, and M. Chowdhury 1996. The impact of improved vehicle design on highway safety. Reliability Engineering and System Safety. 54:65–76.

Johnson–Payton, L.R., Y.Y. Haimes, and J.H. Lambert 1999. Approximating the risk for time–to–failure models through using statistics of extremes. Reliability Engineering and System Safety. 65(1):77–81.

Frohwein, H.I., Y.Y. Haimes, and J.H. Lambert 2000. Risk of extreme events in a multiobjective decision tree: Rare events. Risk Analysis. 20(1):125-134.

Baker, J.A. and J.H. Lambert 2001. Information system for risks, costs, and benefits of infrastructure improvement projects. Public Works Management and Policy. 5(3):199-210.

Frohwein, H.I., J.H. Lambert, Y.Y. Haimes, and L.A. Schiff 1999. A multicriteria framework to aid the comparison of roadway improvement projects. Journal of Transportation Engineering. 125(3):224–230.

Lambert, J.H., J.A. Baker, and K.D. Peterson 2003. Decision aid for allocation of transportation funds to guardrails. Accident Analysis and Prevention. 35(1):47-57.

Pinto , C.A. and J.H. Lambert 2003. Configuration of inter-office switch for extreme traffic with zone configuration evaluator diagram. Reliability Engineering and System Safety. 79(3):369-375.

Pinto , C.A. and J.H. Lambert 2002. Risk of extreme events in the configuration of priority systems. Reliability Engineering and System Safety. 76:265-271.

Olsen, J.R., P.A. Beling, J.H. Lambert, and Y.Y. Haimes 1998. Input–output economic evaluation of a system of levees. Journal of Water Resources Planning and Management. 124(5): 237–245.

Olsen, J.R., P.A. Beling, and J.H. Lambert 2000. Dynamic models for floodplain management. Journal of Water Resources Planning and Management. 126(3):167–175.

Other Readings

Optional or supplemental readings may or may not be available in the library. Find further information about optional readings here.

If you have questions about your required course textbooks, please contact Customer Care at support@waldenu.edu